Cases and articles
Build → Show
Not theory — practice.
Marshrut MES 3.5: shift plan, outsourcing, quotes and an 80-page manual
What's new in version 3.5 and why plans are now by module rather than by number of machines.
How I built a CNC production scheduling system in 30 days
The dispatcher spent 2 hours a day on the Excel schedule. I built a system in 30 days.
Hi, I'm Ilya. I build products in a week instead of writing specs for three months
Six years in manufacturing — then I decided to stop watching and start building.