Version 3.5 covers the whole order path: from pricing for the customer to shipment with documents. Below — what's new and for whom.
For the foreman
- Shift plan by machine. Each work center's queue is laid out over the shift: what, when and how many. You can see what doesn't fit into the shift and where the estimated finish is later than the due date.
- Batch split and alternative WCs. A large batch can be split onto a free machine — both parts run in parallel. The process engineer specifies in advance in the routing where else the operation can be done.
- Outsourcing. Heat treatment, plating, grinding done externally — with quantity, due date and price. On return, good and defective parts are received, and the cost goes into the order cost.
For management and sales
- Quotes. Price from the routing and WC rates, material by consumption rates, lead time from the current shop load. A PDF quote and an order from the quote with one button.
- Shipments. In parts, with a delivery note and a batch passport for every shipment.
For process engineers and the warehouse
- Design revisions. A change notice and a decision for each open order: apply the new routing or finish on the old one.
- Stocktake and tool life. Counting with a report; tool operating time accumulates automatically from handed-in parts, separately for each machine.
Modules instead of limits
Plans differ by modules, not by the number of machines and users: “Basic”, “Production”, “Full”. The AI assistant is a separate module available for any plan. The license is signed, and modules are turned on by the customer in the admin panel.
Manual
Out now: a user manual of 80 pages with screenshots — the workflow for each role, rules for organizing production and lean manufacturing. And one-page quick guides for workstations.