How I built a CNC production scheduling system in 30 days

When the production manager showed me his desktop, I counted 14 open Excel files. That was the schedule for five CNC machines for the week.

“Every evening I spend two hours rearranging this by hand.”

Around that moment I knew what I would be doing for the next 30 days.

Why Excel doesn't work

The problem isn't that Excel is bad. The problem is that it is static, while production is dynamic.

An order is delayed? Redraw. A machine breaks? Redraw. A customer calls? Redraw.

Stack

Flutter (Dart) — UI, all the logic
LocalStorage   — on-device storage
CSV            — export and backup

No server. No cloud. Launch it — it works.

Results

↓70% — time spent on the shift schedule.

+15% — machine utilization thanks to visible free slots.

This experience grew into Marshrut MES — now with a server, work center queues and a shift plan by machine.